|
|
We contracted with Bayview Edison Industries in Mount Vernon, Washington to build the plugs.
|
|
Inside duct plug
|
Outside duct plug
|
|
|
|
|
The next step is to sand the plugs to a fine finish, and then spray the plugs with a surfacing primer that will allow us to fabricate the molds while leaving the plugs
intact.
|
|

|

|
|
Next, we make the molds and connect the two halves to make the duct.
|
|

|
In the picture on the left, Bryan and Bill are preparing the mold to make parts. In the background, Adam, is finishing the second molds.
|
|

|

|
|

|

|
|
|
|
The picture above is the completed duct on our mock-up of the deck.
|
|
|