We contracted with Bayview Edison Industries in Mount Vernon, Washington to build the plugs.

Inside duct plug

Outside duct plug

outside duct plug250

outside duct plug25002

The next step is to sand the plugs to a fine finish, and then  spray the plugs with a surfacing primer that will allow us to fabricate the molds while leaving the plugs intact. 

inside primed plug 250

outside primed plug250

Next, we make the molds and connect the two halves to make the duct.

prepmolds250

In the picture on the left, Bryan and Bill are preparing the mold to make parts.  In the background, Adam, is finishing the second molds.

outsidemold250

outsidemold250a

inside mold250

outside mold250

completed duct250

The picture above is the completed duct on our mock-up of the deck. 